Skip to content
Design rendering of a bedroom suite with a black upholstered bed, a gray rug and linear ceiling lights

Plans, permits & condo approvals Drawings, permits and the association’s paperwork, handled before work starts.

Plans, permits & condo approvals

Paperwork first, then the work.

Most renovations need a building permit, and most condos ask for the association’s approval as well, with its own forms and rules. We bring in the architect and engineer when the work needs drawings, pull the permits and prepare what the association asks for, so the job starts on time and passes its inspections.

What’s included

  • Design and permit drawings, with an architect and engineer
  • Design renderings
  • Building permit applications
  • Condo association approval packages
  • Certificates of insurance for the building
  • Work hours, elevator and loading-dock bookings
  • Inspections, through to the final
26+

Years in business

200+

Jobs completed

99%

Satisfaction rate

How we work

One company, start to finish.

  • One project manager

    One person runs the job, from the first walkthrough to the final inspection.

  • A crew for each trade

    Plumbing, electrical, drywall, tile and finishes, each with its own crew.

  • Permits and approvals

    We pull the permits and, for condos, prepare what the association asks for.

  • 5-year warranty

    On everything we supply and install, materials and workmanship.

How a project runs, step by step

Top